Back to all projects
Villa
Two bathrooms in a villa in Quinzano
The family wanted to renovate both bathrooms in a single job, to finish the work within a month.
The challenges
The two bathrooms shared a drain stack, which had to be replaced for both.
The Full Casa solution
We ran a single job site for both bathrooms, replacing the stack and using the same materials in two color variations.
Works done
- Drain stack replacement
- Two bathrooms with coordinated finishes
- Walk-in showers with fixed glass panels
- Electric towel warmers
- Mechanical ventilation
Similar projects
Primary bathroom
Bathroom with freestanding tub in Borgo Trento
Renovation of a primary bathroom with a freestanding tub and separate shower.
Discover the project
Bathroom
Accessible bathroom in Santa Lucia
A fully accessible bathroom, with a curbless shower, grab bars and turning space for a wheelchair.
Discover the projectWhat our clients say about us
QUOTE REQUEST
TELL US ABOUT YOUR PROJECT
Tell us what you have in mind, even if it's still just an idea. We'll call you back as soon as possible and set up a site visit: an hour at your home, with no obligation, to see whether we can help and what the work really involves.
-
Free site visit
-
No-obligation quote