Townhouse
1970s kitchen in Bussolengo
The challenges
A gas system that needed upgrading, a flue no longer up to code and an existing floor to be joined to the new one without extensive demolition.
The Full Casa solution
We upgraded the gas system, replaced the range hood with a filtered recirculating system and laid the new cement tile floor over the existing one, with a brass threshold to join them.
Works done
- Gas system upgrade and certification
- Recirculating range hood with carbon filters
- Cement tiles laid over the existing floor
- Brass transition threshold
- New electrical system for the area
- Painting in the design colors
Similar projects
Open living area in Borgo Roma
Wall between kitchen and living room removed, new lighting system and a single continuous floor.
Discover the projectAttic conversion in Quinzano
Attic turned into a sleeping area, with roof insulation, two skylights and a new bathroom.
Discover the projectWhat our clients say about us
QUOTE REQUEST
TELL US ABOUT YOUR PROJECT
Tell us what you have in mind, even if it's still just an idea. We'll call you back as soon as possible and set up a site visit: an hour at your home, with no obligation, to see whether we can help and what the work really involves.
-
Free site visit
-
No-obligation quote